This is a new 52,400 ft² facility located on the Prince of Wales Campus for Applied Science and Technology programs. This state of the art facility includes integration of all building systems to allow students, staff and public to interact with this energy efficient building. The facility was designed and constructed based on Green Globes guidelines to achieve a highly energy efficient building.

The facility is unique in that the building's HVAC and geothermal energy systems for the College's "Energy Systems Engineering Technology" program gives graduates nationally recognized training in clean heating and cooling systems.

MCA Consultants Inc. were the prime mechanical consultant responsible for design of plumbing, geothermal, HVAC systems, fire protection, lab ventilation systems and integration of controls.

Construction Cost: Approx. $17,000,000.00
Client: N46 Architecture